LCOH Benchmark Report
for Hydrogen Projects
Scrutiny-grade cost benchmarks, sensitivity matrices, and investor-ready assumptions for hydrogen project teams working through feasibility and internal investment decisions.
Access the free report
Enter your details and we'll send the PDF straight to your inbox.
You're on the list
Your details have been sent. You can download the LCOH Benchmark Report now.
We use your details to send the report and follow up only when relevant.
What this benchmark is for
This report is built for early commercial screening. It helps teams sense-check whether a hydrogen project is in the right cost region before they spend time on deeper engineering, procurement, or financing work.
The benchmark uses a consistent set of market assumptions, cost ranges, and sensitivity logic so you can compare scenarios on the same basis. It is not a substitute for project-specific vendor pricing, dispatch modelling, or a lender-grade financial model.
Want to inspect the live calculator logic as well? Use the LCOH calculator methodology section for the on-page assumptions summary.
What's inside
Scale-adjusted benchmarks
CAPEX and OPEX reference ranges calibrated by project scale — from 1 MW to 100 MW+.
Sensitivity matrices
Ready-to-use tables showing how LCOH moves with electrolyser cost, capacity factor, and power price.
Investor-ready assumptions
Financing heuristics and validation checks aligned with lender and offtaker scrutiny.
Procurement watchpoints
The cost line items most teams underestimate at feasibility — stack replacement, BOP, permitting.
Want to run your own numbers? Try the free LCOH Calculator for a live project screen.